Laza HPP
- 2800 MW
Installed Capacity
- 14,720 GWh
Average annual energy
- 189.5 M
High dam
- 116 M
Net head of water
Laza HPP is located on the main stream of the Malikha River. Its dam site is about 160 km from Myitkyina City. Its installed capacity is 2800 MW and average annual energy is 14,720 GWh. Its dam is a 189.5 m high concrete face rockfill dam. The reservoir has a normal pool level of EL370m and a total storage of 13.134 billion cubic meters.
Survey and design for Laza HPP were commenced but suspended due to armed conflicts in north Myanmar on April 26, 2012.