Project  Introduction


伊江项目流域规划图2 (英文).jpg

Ayeyawady River Hydropower Project is located in Kachin State. It is planned to construct 7 cascade HPPs (including Myitsone HPP, Chipwi HPP, Laza HPP, Wutsok HPP, Hpizaw HPP, Kawnglanghpu HPP and Renam HPP) and Chipwi Nge HPP in the upper reaches of the Maykha River, the Malikha River and the Ayeyawady River. The total planned installation capacity is about 21600 MW with an average annual energy output of 110,000 GWh. The total investment is more than USD 25 billion. Meanwhile, roads, power grids and other supporting facilities are planned as well.

伊江项目位于克钦邦,规划在恩梅开江、迈立开江及伊洛瓦底江上游建设密松、其培、腊撒、乌托、匹撒、广朗普、耶南等7级流域梯级电站及小其培电站,规划总装机容量约2160万千瓦,多年平均发电量1100亿千瓦时,总投资超过250亿美元。为满足需要,同步规划建设流域内道路、电网等配套设施。