Kawnglanghpu HPP

  1. 3000         MW

    Installed Capacity

  2. 16,080           GWh

    Average annual energy

  3. 233          M

    High dam

  4. 193          M

    Net head of water

2.7 广朗普电站.jpg

Kawnglanghpu HPP is the second cascade HPP planned on the main stream of the Maykha River. Its dam site is about 270 km from Myitkyina City. Its installed capacity is 3000 MW and average annual energy is 16,080 GWh. Its dam designed is a 233m high concrete face rockfill dam. The reservoir has a normal pool level of EL875m and a total storage of 2.943 billion cubic meters.


Survey and design for Kawnglanghpu HPP were commenced but suspended due to armed conflicts in north Myanmar on April 26, 2012.